Sand and Cement Calculator for Patio Pavers

Material Calculation Formulas:

\[ \text{Cement (kg)} = \left[\text{Area (m²)} \times \text{Thickness (m)} \times 1.33 \times \left(\frac{1}{1 + \text{ratio}}\right)\right] \times 1440 \] \[ \text{Sand (kg)} = \left[\text{Area (m²)} \times \text{Thickness (m)} \times 1.33 \times \left(\frac{\text{ratio}}{1 + \text{ratio}}\right)\right] \times 1600 \]

meters
(e.g., 1:4 = 4)

Unit Converter ▲

Unit Converter ▼

From: To:

1. What is This Calculator For?

This calculator determines the amount of cement and sand needed for patio paver bedding mortar. It helps in planning and purchasing the right quantities of materials for your paving project.

2. How Does the Calculator Work?

The calculator uses these formulas:

\[ \text{Cement (kg)} = \left[\text{Area} \times \text{Thickness} \times 1.33 \times \left(\frac{1}{1 + \text{ratio}}\right)\right] \times 1440 \] \[ \text{Sand (kg)} = \left[\text{Area} \times \text{Thickness} \times 1.33 \times \left(\frac{\text{ratio}}{1 + \text{ratio}}\right)\right] \times 1600 \]

Where:

3. Importance of Accurate Material Calculation

Details: Proper material calculation ensures you have enough materials without excessive waste, maintains the correct mortar strength, and helps with project budgeting.

4. Using the Calculator

Tips: Measure your area accurately in square meters. Typical bedding thickness is 0.025-0.05m. Common ratios are 1:4 or 1:5 (cement:sand).

5. Frequently Asked Questions (FAQ)

Q1: What is the 1.33 factor?
A: This accounts for material compaction and voids when the bedding layer is compacted.

Q2: What ratio should I use?
A: For patio pavers, 1:4 or 1:5 (cement:sand) is typical. Higher cement content makes stronger but less flexible mortar.

Q3: How thick should the bedding layer be?
A: Usually 25-50mm (0.025-0.05m) depending on paver size and subbase condition.

Q4: Should I add water in the calculation?
A: No, these are dry material calculations. Water is added during mixing.

Q5: How accurate are these estimates?
A: They're good estimates but account for 5-10% extra for waste and irregularities.