Render Calculation Formulas:
From: | To: |
Render calculation determines the quantities of cement and sand needed for plastering or rendering work based on the area to be covered, thickness of the render layer, and the cement-sand mix ratio.
The calculator uses these formulas:
Where:
Details: Proper calculation prevents material wastage, ensures structural integrity, and helps in accurate cost estimation for construction projects.
Tips:
Q1: What is a typical render thickness?
A: For walls, 15mm (0.015m) is standard. For rough surfaces, up to 20mm may be needed.
Q2: What are common cement-sand ratios?
A: 1:3 for external renders, 1:4 for internal renders, 1:5-1:6 for base coats.
Q3: Why the 1.33 multiplication factor?
A: This accounts for the volume increase when dry mix becomes wet mortar (bulking factor).
Q4: How to convert kg to bags of cement?
A: Divide cement kg by 50 (standard bag weight). For Xkg, about X bags.
Q5: Does this account for wastage?
A: No, add 5-10% extra to account for spillage and uneven surfaces.