Home Back

Cement Sand Aggregate Calculation For M15 Wall

M15 Concrete Mix (1:2:4 Ratio) Formulas:

\[ \text{Cement (kg)} = \left[\text{Volume (m³)} \times 1.54 \times \left(\frac{1}{7}\right)\right] \times 1440 \] \[ \text{Sand (m³)} = \text{Volume} \times 1.54 \times \left(\frac{2}{7}\right) \] \[ \text{Aggregate (m³)} = \text{Volume} \times 1.54 \times \left(\frac{4}{7}\right) \]

Unit Converter ▲

Unit Converter ▼

From: To:

1. What is M15 Concrete?

M15 concrete is a standard grade concrete with a mix ratio of 1:2:4 (cement:sand:aggregate) by volume. It has a characteristic compressive strength of 15 N/mm² after 28 days of curing.

2. How Does the Calculator Work?

The calculator uses these formulas:

\[ \text{Cement (kg)} = \left[\text{Volume (m³)} \times 1.54 \times \left(\frac{1}{7}\right)\right] \times 1440 \] \[ \text{Sand (m³)} = \text{Volume} \times 1.54 \times \left(\frac{2}{7}\right) \] \[ \text{Aggregate (m³)} = \text{Volume} \times 1.54 \times \left(\frac{4}{7}\right) \]

Where:

3. Importance of Proper Mixing

Details: Accurate material calculation ensures structural integrity, prevents waste, and maintains the desired concrete strength and workability.

4. Using the Calculator

Tips: Enter the volume of concrete needed in cubic meters. The calculator will provide the required amounts of cement (in kg), sand and aggregate (both in m³).

5. Frequently Asked Questions (FAQ)

Q1: Why is the dry volume factor 1.54?
A: This accounts for voids between particles and compaction during mixing, ensuring you get the desired wet volume after mixing.

Q2: Can I use this for other concrete grades?
A: No, this is specific to M15 (1:2:4 ratio). Other grades like M20 or M25 have different mix ratios.

Q3: How accurate are these calculations?
A: They provide good estimates for planning purposes, but actual requirements may vary slightly based on material quality and site conditions.

Q4: Should I account for wastage?
A: Yes, it's recommended to add 5-10% extra to account for spillage and other losses during mixing and pouring.

Q5: What if my sand is wet?
A: Wet sand has higher volume due to water content. You may need to adjust quantities based on moisture content.

Cement Sand Aggregate Calculation For M15 Wall© - All Rights Reserved 2025