Material Calculation Formulas:
From: | To: |
This calculator helps determine the amount of cement and sand needed for brickwork wall construction based on the mortar volume and cement-to-sand ratio.
The calculator uses these formulas:
Where:
Details: Accurate material calculation ensures proper structural integrity, avoids wastage, and helps in cost estimation for construction projects.
Tips: Enter mortar volume in cubic meters and the cement-to-sand ratio (the second number in the ratio). For example, for 1:4 ratio, enter 4.
Q1: Why multiply by 1.33?
A: This accounts for the dry volume of mortar which is about 33% more than the wet volume due to voids and bulking.
Q2: What are typical cement-sand ratios?
A: Common ratios are 1:3 to 1:6 depending on the application. 1:4 is standard for general brickwork.
Q3: How to estimate mortar volume?
A: Typically 0.03 m³ per square meter of wall area for standard bricks with 10mm joints.
Q4: Why different densities for cement and sand?
A: Cement particles are much denser than sand particles, hence the different density factors.
Q5: Does this account for wastage?
A: No, you should add 5-10% extra to account for spillage and other losses.